When Iwas a child, watching the garage master skilled San Renault CAN Clip
Liangxia get the fault broke down the gross vehicle feel they are
really too much, regardless of the vehicle is what difficulties, these
repairman there is always way to fix a broken car, so impression has
always been deeply rooted in my mind, grow up, when the idea of
Blackhand, also has been extended to my first job ─ ─ in a well-known
tuner to work (the first month's wages chip with the exhaust pipe) .
The day technicians unit, give me back into the game, put on uniforms,
pick up Houmian gloves, your car would like to modification, to me on!
ABT Taipei Shop is the place of the day technicians Shanggong, our plan
is to experience in accordance with the owners into the plant process,
of course, start playing a reception role. ABT Shop identical to the
entire service process and the maintenance of the distributor Direct
Factory owners into the plant by the reception to pick up the first
interrogation, communication with the owners need modification or
service, in the understanding of the owners the demand only after the
beginning of the next action. The reception of the entry is very
important, In addition to the understanding of site guests' needs, and
have to make appropriate recommendations, and keep the back end of the
technicians of coordination and communication, subsequent modifications
job in order to formally commence. To visitors in the house, I
grabbed the work orders to trot ran to the reception area, this is the
first guest of the day technicians, the appetite of the guests is no
small power to change how much the whole car ABT appearance of the
essential , brakes, wheels, suspension all together put, this is the
people to show its mettle, but the guests right heroic, but the process
of course can not be less, still have to be explained in accordance
with the requirements of the guests retrofit projects, functions,
nature, costs and construction time, and even modified in addition to
performance improvements, other negative effects should have taken the
trouble to explain.
Explain all of the conversion program and guests agree to be modified
in preparation for the guests of the car allowed to enter the plant,
when I opened the door ready to get on the driver's seat on the
occasion, the director suddenly to stop me on the train, the original, I
forgot to do shift car preparation before ─ ─ wrapped steering wheel
jacket, seat jacket and paper floor mats. All owners of vehicles in the
approach to get the best care, even if no exception is in a converted
factory, then the director also told me shift car with the test of
time, can not change the owner of the seat, air-conditioning and sound
settings, but also in the car on the first record of the vehicle mileage
and fuel residual. Covered with a sheath to protect the seat and
direction, and slowly the car of the guests from the reception area be
allowed to enter the factory, most of the kit had to be installed from
the bottom of the vehicle, I follow the command of the other
technicians, park the car in roof height above the machine. Parked, I
walked to the top machine console ready button to rising vehicle,
again, the factory manager to stop before the original vehicles from the
top, you must first confirm the correct location of parking between
the ceiling height of the machine and vehicle must be put in into the
support of high-density foam. Support with foam was placed in the
anchor position in the bottom of the vehicle, on the one hand, to avoid
crushing the roof height chassis structure, on the other hand, can
avoid the squeeze has already been installed on the car side skirts,
regardless of any vehicles, is a very important action. Into
high-density foam pad and confirmed that security is no doubt, was
finally able to press the top of the rise of machine button, just from
the factory to the roof starting to have so many precautions, which
touches people began material no time, this meticulous attitude, indeed
the heritage to the fraction of the German spirit of the craft.
Work orders recorded a long list of owners want to modified the
project, people confusing at first glance, the exhaust pipe of the
engine management program to upgrade the shock absorbers, tires of the
short spring, ring, although modified in these projects completed this
already with the package of a full set of ABT Scirocco will become of
ABT the Complete Car, but commence before a large number of retrofit
projects must arrange the order of construction, in order to effectively
shorten the construction time to avoid the owners wait too long. The
owners of the specific set of ABT wheels have been grilled on gun black
paint with orange outer edge and can not be loaded first, but then also
replace the short spring, or much time dismantling works, after
consultation with the factory director, decided to row trachea to start
construction, because the exhaust pipe can be straight up and down, in
addition to chassis shield completely with the other chassis
components interfere with each other. In determining the construction
sequence, go to the parts department to receive the necessary parts,
exhaust system is not heavy, consuming effort handling when really
Liantuo Dai drag near the vehicle moved from the warehouse to let me
sweat, which has not yet begun construction consumes more than half
strength, people really be embarrassed, but since boasted to be a
technician, a day had to come up with 120 points, the strength to get
the job done. In all parts of the screw on the spray lubricants, heat
allows the lubricant accumulated in the exhaust pipe into a puff of
smoke, however, do not do this, the screws on the exhaust pipe is
difficult to remove, to relax after all the screws, then loose open
the exhaust pipe to catch the ear, the heat of the exhaust pipe with
weight As expected, it can not be relaxed, have through the auxiliary
support platform can safely remove the.
Installed on the exhaust pipe, fastened bundles and catch the ear, and
careful calibration of the exhaust tube location to become the final
stage of installation, new installation of the exhaust pipe is located
in the correct position and angle are very important, not only affect
the exhaust pipe tail side position, if the exhaust pipe to catch the
ear part of the contact to the body in motion will be issued unpleasant
resonance, although the pursuit of performance people are less likely
to care about the exhaust noise is larger, but abnormal resonance or
within the range of the noise is absolutely not tolerated. With plastic
hammer, pull the lever slowly fine-tuning the position of the exhaust
pipe of ABT products of high precision for us to reduce the workload of
several under the fine-tuning the exhaust pipe in the correct
position; then start the engine to confirm the seams leakage. Before
the engine, the tension has been close to critical, just installed,
there is no error, the screws are tight, all the process begins in the
mind like a repeat as marquees; the slips engine crashing sounded that
another technician has light quiet climb up the driver's seat? move the
engine, and asked me to check the convergence for leaks, I took off my
gloves to hand feel of the interface surrounding hit an OK gesture
with the technician on the driver's seat after confirming that no leak,
with the engine turn off, he smiles: "how to check for so long?" I
thought to myself: "just installed the first exhaust pipe, I do not
want to" leak "..."
Finished loading the exhaust pipe is then ready for a facelift high
flow air filter, high flow air filter is necessary for a turbo car,
modified products, also means the need to boost the value of improve
more the air. High flow air filter has a variety of exchange, the type,
in addition to the standard of the set of corresponding to the
original air box and tube commonly known as mushroom-shaped form of the
mushroom-design has increased the range of intake, but the majority do
anything put into the the original set of gas in the box, the
installation location and stent had to be considered. Either naturally
aspirated or turbocharged engines requiring low intake air temperature,
the original set gas tank does not fit the mushroom head, but the
front of the inlet pipe is relatively well, if the original set of gas
box is discarded, then additional insulation works have to be ready for
the mushroom head. Neuspeed P-Flo kit ready for this car is perfect
addition to the air filter body, and all piping, screws and insulation
panels attach, simply remove the original air filter box on the free
installation location, then follow the Ford Ids Vcm instructions in the order to assemble all attachments can be easily installed.
没有评论:
发表评论